What is the configuration of the brackets and how are they fitted?
A wall-hung pan is being installed on a studded application. What is the configuration of the brackets and how are they fitted?
The pan must be installed 320mm off the floor to fixing hole centres. The brackets will be installed inside the cavity of the wall, or the other side of the wall. The brackets must be screwed to floor into a 6”x 4” joist or similar. The pan is then hung off two metal 10mm rods that are attached to the cast-iron brackets. (We do have details of the configuration that can be faxed through to the installer).



